WATER TREATMENT PLANTS IN VITERBO

Design, construction and management of 33 water treatment plants necessary to purify water resources manly polluted by arsenic and fluorides.

The system implied:

–  absorption filters based on iron hydroxide and lanthanum oxide to remove arsenic

– absorption filters with activated alumina to remove fluorides.

Our works included a series of interventions to remove turbidity and other pollutants from some particular areas.

These plants, completely automatized, treat a global flow of over 500 l/s; they have been designed and realized considering multiple technical measures which allow a simple management and a constant control of outgoing water quality as a guarantee of the service.

Category
Drinking water